Standard not met | Reason | Action being taken by the Pharmacy | By when | Notification By Pharmacy Improvements Made |
---|---|---|---|---|
3.1 | There are dirty and untidy areas of the pharmacy that are detrimental to the safe provision of services. There are significant health and safety risks presented by the locked and obstructed fire exit, the lighting arrangements for the toilet and tripping hazards. |
The Pharmacy has been intensively cleaned and all surfaces have been wiped and cobwebs cleared. The Fire exit has been cleared from all obstruction and will be unlocked when the store is open. I have arranged for a builder to stat works on the 15th of June 2019. It is anticipated for this to be completed in 4 working days time. |
27/06/2019 | 24/06/2019 |
3.3 | There is inadequate hygiene and infection control for the safe provision of services as a result of the lack of hot water on the premises. |
The hot water tap issue will be replaced and a new immersion heater will be installed to provide hot water. |
27/06/2019 | 24/06/2019 |